Leamington
Lift Bridge
page 2
|
A new hydraulically driven lifting mechanism, which uses hydraulic cylinders with “jiggers”, is located under the road. |
Animation Of The New Lifting Mechanism |
Synchronisation between the East and West sides of the bridge is achieved by careful selection of the hydraulic cylinder dimensions and a system of hydraulic valves. The new control system is designed to be easily upgraded to incorporate power operated pedestrian barriers or gates and user operation if these become necessary in the future.
Video Of
The Bridge After Refurbishment
To play the clip move pointer over video image
|
Bridge Deck In The Works |
Sheaves During Refurbishment |
Owning Authority - British Waterways Scottish Region
Project manager R.E.Jackson.
Main Contractor - Lambertons Ltd of Coatbridge
Project Manager R. Mclaren.
Consulting Engineer - M.G.Bennett & Associates
Project Engineer R.J.Parrott