Leamington Lift Bridge

page 2

 

 

A new hydraulically driven lifting mechanism, which uses hydraulic cylinders with “jiggers”, is located under the road.

 

 

Animation Of The New Lifting Mechanism

 

Synchronisation between the East and West sides of the bridge is achieved by careful selection of the hydraulic cylinder dimensions and a system of hydraulic valves.  The new control system is designed to be easily upgraded to incorporate power operated pedestrian barriers or gates and user operation if these become necessary in the future.

 

Video Of The Bridge After Refurbishment

To play the clip move pointer over video image

 

 

Bridge Deck In The Works

 

Sheaves During Refurbishment

 


Owning Authority -                 British Waterways Scottish Region

Project manager R.E.Jackson.

 

Main Contractor -                  Lambertons Ltd of Coatbridge

Project Manager  R. Mclaren.

 

Consulting Engineer -            M.G.Bennett & Associates

Project Engineer R.J.Parrott

 